The joint, up close

A timber beam, a steel connector and the raking light across them. This is a detail that has to stay precise from the 1:50 model to the building on site.

Clara Vogt prepares the permit drawings where such joints are fixed. Permit drawings take ten to twelve weeks and start from €14,000, excl. VAT.

← Back to the journal

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.