One weekend, one floor. Back at work on Monday.

Office relocation · Antwerp & 150 km

( 01 )

Moved by Monday

One weekend, one floor, nothing lost.

Every relocation starts on Friday at 18:00 and finishes before Monday at 07:00. By keeping the physical move inside one defined sixty-one-hour window, a company avoids split workdays, disrupted teams and lost revenue. Furniture, equipment and files travel between floors or across cities without touching a normal working hour.

The method is advance planning, not hurry. Three weeks ahead, every desk, cable bag and reusable crate receives a destination number and a team colour. By the time loading begins at the depot on Friday night, each item already has its exact place on the receiving floor.

Long office corridor at dusk with grey crates on rolling dollies against the wall.
Three crew members wheeling stacks of crates across a spacious empty office floor.
Coiled cable bundle tagged with a blank label inside a clear plastic bag.

Saturday, 09:40. The first floor is empty; every crate on the dollies already knows its desk. Protective floor coverings keep corridors and lift lobbies clean while the stacks move into their zones.

Crate dollies queued in a lift lobby protected by floor boards during an office move.

( 02 )

Survey, label, lift

Five phases, so the weekend holds.

A disciplined process built to remove moving delays. Every phase has a name, a time and a person responsible, so nothing about your move is decided on the Friday evening.

Week −6

Survey

A free walk-through of both floors with Samir Haddad: measurements, doorway widths and photographs of every room.

Week −3

Plan & label

A labelled floor plan gives each team one colour zone and each desk one number. Every crate and cable bag gets its matching destination tag.

10 working days before

Pack

Reusable crates arrive at your office. Staff pack their own desk, about six crates each, with three weeks of rental included.

61 hours

The weekend

Friday 18:00 lift and load. Saturday 07:00 the old floor is empty. Desks and IT are back by Sunday 12:00; the keys return on Monday 07:00.

Monday, 07:00–12:00

Monday

Two crew members stay on site all morning for small fixes. The crates are collected within three weeks.

The move window

61 hours

Fri 18:00 → Mon 07:00

From the first lift on Friday evening to the keys going back on Monday morning.

Crates arrive

10 working days

Before the move

Delivered to your office early, so every desk is packed and labelled before the crew comes.

Crate rental

3 weeks

Included in every move

The crates stay with you after the move and are collected within three weeks.

( 03 )

Friday 18:00 to Monday 07:00

The sixty-one-hour transition runs through five fixed milestones. You close on Friday afternoon; on Monday morning your team sits down at its own desks.

Fri 18:00

Lift and load. Staff leave for the weekend; crates and dismantled furniture go onto the vehicles.

Sat 07:00

The old floor is empty and the new floor is set out from the labelled plan.

Sun 12:00

Desks are built, IT cabling and monitors are connected and powered.

Sun 20:00

Walk-through with you to inspect every workspace.

Mon 07:00

Keys go back to your facility manager; the floor is ready to open.

Two crew members assembling metal desk frames under bright work lights at night.
Saturday, 22:15
Office workers arriving at newly arranged desks with monitors on, Monday morning.
Monday, 08:05

( 04 )

One move

Architecture studio interior with rows of assembled desks and tall windows after the move.

Forty-two desks, two floors down

Ghent · 42 desks · Fri 18:00 → Sun 16:40

On Friday at 18:00 our crew arrived at an architecture studio in Ghent to merge forty-two desks from two floors into one. The studio had packed over the previous ten working days, so the crew could go straight to protecting the drafting tables and the catalogued scale drawings.

By Saturday morning both upper floors were cleared to the bare walls. Reassembly began on the lower level at sunrise under Kwame Mensah and Ana Ribeiro, while Joanna Kowalczyk connected cables and computers to their numbered workstations.

At 16:40 on Sunday the studio manager made the final inspection, more than fourteen hours before opening. All forty-two desks were powered, aligned and clean when the team arrived on Monday.

The floor was fully working before Sunday evening. On Monday everyone unpacked their crate and was drafting by nine.

Hanne De Smet, studio manager
Trolley loaded with sealed archive crates and tamper tags in a quiet law-office corridor.

The law office that never closed

Brussels · 26 desks

Padded equipment case wheeled into a small server room beside laboratory benches.

Benches, a rack and a cold room

Mechelen · 64 desks

( 05 )

Prices

You get a fixed written quote after Samir completes your free survey, with no hourly meter running on the weekend. Every quote includes planning, travel and transport within 150 km of Antwerp.

ItemPrice
Site survey and labelled floor planIncluded
Small office move, up to 15 desksfrom €3,900
Office move, 16–40 desksfrom €8,600
Floor move, 41–90 desksfrom €17,500
IT disconnect and reconnect€38 per workstation
Extra reassembly crew€65 per crew hour
Secure document and hardware disposal€140 per locked cage

All prices in EUR, excl. 21% VAT. Every move starts with a free survey.

( 06 )

The crew

Five crew members in charcoal work clothes standing together on an empty office floor.

Every move is carried out by employed, permanent crew, not day labour. The same crew leads who walk through your labelled plan on Friday evening run the furniture rebuild and the IT reconnection until Sunday night, so one person always answers for each floor.

With office equipment, knowing the labelling system and the building matters most. We know which desk each crate belongs to before we touch it.

Kwame Mensah, crew lead

Lena Vos, Samir Haddad, Mei Lin Hartmann, Kwame Mensah, Ana Ribeiro, Joanna Kowalczyk, Tom Verbeke

( 07 )

Questions

What if Monday is a holiday?

When Monday is a public holiday the move window extends to Tuesday 07:00 at no extra charge, which leaves more time for cleaning and complex layouts.

Do we pack ourselves?

Staff pack their own desk and files into reusable crates delivered 10 working days before the move. The crew handles shared storage, furniture, screens and archives.

What about IT?

Joanna Kowalczyk’s team photographs every desk setup, coils cables into numbered bags, uncouples docking stations and reconnects each monitor and device at the new desk by Sunday noon.

Insurance

Goods, electronic equipment and the building’s transit areas are covered by our transit and public liability insurance from Friday load-in until Monday sign-off.

( 08 )

Request a quote

Hands holding a clipboard with a floor-plan drawing resting on a grey crate.

Tell us three things

  1. Your desk count and office size.
  2. Your current and new addresses.
  3. The weekend you have in mind.

Mei Lin Hartmann calls within one working day to go through your schedule and book a free survey with Samir Haddad.

Phone: +32 3 555 01 41