An installer on a ladder measuring a roof slope
A surveyor and a homeowner in a driveway pointing at the roof

[01] How it works

How It Works

A free roof assessment, then a written proposal. Nothing to sign until you have read it.

[02] The four steps

From the first call to switch-on.

Book

1

Phone, email or the form; we reply within one working day.

Visit

2

45 minutes on site: roof condition, pitch, shading, meter and fuse board.

Proposal

3

Written within 5 working days: system size, layout, price, est. output and saving.

Install

4

Usually 1–3 days on the roof; switch-on after inspection, typically 4–8 weeks from yes.

Typically 4–8 weeks from a signed proposal to switch-on, including permits and the network inspection.

[03] What we check

Forty-five minutes, mostly looking up.

The roof

Condition of the tiles or shingles, the pitch and the age of the covering.

Shading

What shades each slope between nine and three, and in which season.

The meter and fuse board

They decide how a system can be connected and whether it needs an upgrade.

Your usage

A recent bill, so the size matches what you actually use.

[04] What you get

A written proposal in five working days.

The proposal shows the layout on your roof, the system size, the installed price, the estimated yearly output and saving, and every assumption behind them. It is yours to keep whether or not you go ahead. If you do, the deposit is 10% on signing and the balance is due at switch-on.

[09] Free roof assessment

Ask us to look at your roof.

A 45-minute visit, a written proposal in 5 working days, and no obligation. Phone (555) 014-2290 or use the form.

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.