Hands holding a tape measure against a bare wall beside a pencil floor plan.

Survey to handover
five steps, one budget

Process

From initial survey to final handover, every renovation follows five clear stages. You always know who is leading your project and exactly what will be delivered.

PROCESS

Survey to handover

01

Survey

Week 1

The 90-minute visit on site, followed by a thorough measured survey within 7 days.

Who Mara Ellison or Hanna Lind

You get Written notes within 3 working days, and a measured survey.

02

Brief and budget

Weeks 2–3

One written page outlining the scope of the work and one fixed budget number.

Who Ayo Mensah

You get One written page and one budget number.

03

Design and samples

Weeks 3–7

Detailed drawings and a physical sample board you can hold against your wall.

Who Mara Ellison, Hanna Lind and Priya Nair

You get Drawings, a lighting scheme and one sample board.

04

Works on site

Shops 3–9 weeks, flats 5–14

Jonas leads on site every week, coordinating all of the finishing trades.

Who Jonas Weber, with Tomás Reyes

You get A weekly site visit and a short written update.

05

Handover

Final week

One joint walkthrough, care notes for every finish and a return visit after 6 months.

Who Mara Ellison and Ayo Mensah

You get Care notes for every finish and a return visit after 6 months.

A project in progress

ON SITEWeeks 4–6

Hands applying smooth lime plaster to an interior wall using a steel trowel.
Hands holding a fabric swatch and ceramic tile against an oak material sample board.
Designer holding a linen swatch against fresh plaster beside an oak alcove shelf.

3 2 1

1. Plaster: the third coat goes on in the morning, troweled tight.
2. Samples: linen and a pale tile held against the oak board.
3. Fitting: the last oak board slides into the alcove shelf.

4 coats · 4 days · 1 sample board

Brief: What a week on site looks like, from the wall to the shelf.


Survey, brief, and design

Stage one begins with a ninety-minute consultation visit on site during week one, followed by a full measured survey within seven days. In weeks two and three, Ayo Mensah prepares a single written page outlining the agreed brief alongside a fixed budget figure. Stage three spans weeks three to seven, led by Mara Ellison and Hanna Lind. During this phase, you receive complete architectural layouts, lighting schemes, joinery elevations, and a physical sample board featuring lime plaster, stone, and oak that you can hold directly against your existing walls to test the daylight.

Works on site and handover

Stage four covers physical construction, lasting between three and nine weeks for small shops, or five to fourteen weeks for residential flats. Site lead Jonas Weber is on site every week to manage plasterers, electricians, and trades, while Tomás Reyes installs workshop-built cabinetry. Stage five is project handover. We conduct a thorough final walkthrough, provide detailed written care notes for lime and timber surfaces, and return after six months to inspect settles, hinges, and finishes. We never run more than five active sites at once, ensuring focused personal attention throughout.

Every step ends with something you can hold, read or walk through. If you would like to see how it starts, the first step is a single visit.

BOOK A CONSULTATION

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.