HomeCase stories
Case Stories

Review completed workplace charging installations across offices, distribution yards, and healthcare facilities. Each project demonstrates our practical approach to electrical capacity, hardware selection, and minimal site disruption.

Brightwell Offices: Staff Car Park Installation
At Brightwell Offices, the facility management team needed charging facilities for an expanding corporate staff car park. The property featured 36 staff bays arranged along external concrete perimeter walls. Tomas Reyes evaluated the main switchboard and identified sufficient spare capacity to support eight dedicated charging points without grid reinforcement. Our installation team, led by Amara Okafor, fitted 8 wall units over 2 days on site, neatening cable runs along existing overhead containment trays. The resulting installation allows employees to charge steadily throughout the workday while preserving open pedestrian pathways and parking bay clearances across the entire facility.
- 8 wall units
- 36 staff bays
- 2 days on site

Harlow Lane Print Depot: Commercial Fleet Bays
Harlow Lane print depot operates a busy commercial distribution fleet where delivery vans require reliable overnight charging. The depot yard encompasses 14 van bays backed onto an open gravel and asphalt yard without adjacent building walls. We installed 4 twin posts mounted to solid concrete island foundations, providing charging connections for eight vans simultaneously. To prevent main switchboard trips when high-capacity printing presses run evening print batches, Lena Brandt integrated our €640 load-management module. The installation took 3 days on site, delivering robust, weather-resistant fleet charging that keeps delivery vans operational every morning.
- 4 twin posts
- 14 van bays
- 3 days on site

Northfield Health Centre: Visitor and Clinical Bays
Northfield Health Centre required accessible, dependable charging for medical staff and outpatient visitors. The facility car park provided 6 visitor bays situated adjacent to the primary clinic entrance. Our survey indicated that ground-standing units would provide the best usability and accessibility for visiting drivers. Owen Castell and Amara Okafor fitted 3 twin posts in just 1 day on site, managing ground ducting and electrical connections with minimal disturbance to clinic operations. The charging points now serve visitors and healthcare practitioners with straightforward plug-in charging, backed by ongoing annual service inspections from Sofia Lund.
- 3 twin posts
- 6 visitor bays
- 1 day on site