Fitter in grey work clothes kneeling beside a half-mounted wall charger on a concrete car-park column, holding a coiled cable

Workplace EV charging · Site assessment

Charging for the car park you already have.

We survey your existing electrical supply, plot neat cable routes and specify dependable workplace chargers. Start with a thorough 90-minute assessment on site before you commit to any hardware.

Workplace charging works because cars are already parked for hours.

For the people who drive in

  • Reliable workday charging at the bay
  • Plug in and walk away, no card hunting
  • The car is ready by departure

For the people who run the building

  • Protected switchboards and managed peak load
  • Tidy cable routes on walls and ceilings
  • Clear power records for each unit

Workplace charging succeeds because vehicles stay parked for hours while their drivers work, so nobody needs a hurried top-up. Dedicated chargers turn ordinary dwell time into practical range without a costly grid upgrade, and a survey first means the equipment is sized to the building you already run.

Which sites suit

We assess dedicated staff car parks and operational fleet bays to confirm the layout, the cable routes and the incoming electrical capacity. Pick the kind of site that looks most like yours.

Staff car parking bays under a canopy with wall chargers mounted on concrete columns
  • Dedicated staff bays with a regular daytime dwell
  • Structural concrete columns or walls close to the bays
  • Spare capacity at the main switchboard, or room for load management
  • A clear route for a cable tray along a wall or ceiling
  • A facilities contact who can walk the site with us

We check each point against your layout during the 90-minute visit and put the result in writing.

Delivery vans backed into parking bays beside twin-socket EV charging posts
  • Vans or cars parked overnight or between shifts
  • Bays that pair up so one post serves two vehicles
  • A yard surface that takes a post foundation or kerb island
  • Incoming supply that can carry overnight charging on a schedule
  • Room to keep cables off walkways and out of wheel paths

Twin-socket posts between bays charge vans reliably overnight without crowding the yard.

Perimeter concrete wall of an office car park with mounted chargers and leaf shadow

A clean run of wall-mounted units along an office car-park wall, on the columns and cable trays that were already there.

What the assessment includes

Our on-site assessment looks at four things before you spend anything on equipment: the capacity of your distribution board, the cable routes, where each bay sits, and the plan and fixed cost that come out of it.

Assessor testing an open distribution board with a handheld multimeter

Switchboard capacity

We test spare capacity at the main intake and log the baseline load.

Technician extending a tape measure along an overhead cable tray on a concrete ceiling

Cable routes

We measure the runs along ceilings, walls and trenches before any drilling.

Site surveyor marking a parking bay corner with white chalk beside a clipboard

Bay layout

We mark each bay, check clearances and ground surfaces, and fix positions.

Printed site assessment plans and notes resting on a car bonnet with a pen

Written report

You receive a full plan and a fixed quote within 5 working days.

Site assessor and facilities manager walking along a covered car-park concrete ramp talking

A visit, in order

Our site assessor meets your facilities manager at the car park entrance to review daily vehicle patterns, bay access and building requirements. We walk the bays together to identify the best charger locations and check physical clearance.

Next, we inspect the main electrical intake and the distribution boards, measuring spare capacity and logging the existing baseline load. We map efficient cable paths along walls and ceilings so the installation stays tidy and unobtrusive.

Finally, we record exact bay dimensions, check ground surfaces and assess metering options for company vehicles. Within 5 working days we deliver an engineering report and a fixed quotation that stays valid for 60 days.


90 min

On site

5 working days

To your written report

60 days

Quote validity

Pricing

Clear, upfront commercial pricing with no unexpected extras. The site assessment is credited in full against your installation if you go ahead.

ServiceWhat it coversPrice
Site assessment visit, up to 12 baysCredited against the install€290
Each further 12 bays assessedAdditional survey capacity€120
7.4 kW wall unit, fittedComplete hardware and installationfrom €1,480 per unit
Twin-socket post, fitted (2 bays)Serves two adjacent parking baysfrom €2,950
Load-management moduleDynamic building supply protection€640 per site
Annual service visitRoutine safety inspection and testing€180 per site + €25 per unit

Prices are in euros, excluding VAT. Your fixed quote follows the site visit and stays valid for 60 days.

Stories

Three installs, with the bays, units and days on site that each one took.

Finished row of wall-mounted charging units along an office car park with a parked car

Brightwell Offices

We installed wall units on the structural columns of a staff car park, giving employees dependable daily charging without disrupting parking. The work went bay by bay so the car park stayed open.

  • 8 wall units
  • 36 staff bays
  • 2 days on site
Commercial vans plugged into charging posts in a depot yard in clear dusk light

Harlow Lane print depot

Twin posts were fitted between the van bays of a working print depot, so the delivery vans charge fully overnight. Cable routes were kept off the loading apron and out of the wheel paths.

  • 4 twin posts
  • 14 van bays
  • 3 days on site
Twin-socket charging post in visitor parking bays beside a modern health centre building

Northfield Health Centre

Visitor bays beside a low clinic building were fitted with twin posts in a single day, so patients and visitors can charge during an appointment. The posts sit on the kerb line, clear of the entrance.

  • 3 twin posts
  • 6 visitor bays
  • 1 day on site

Frequently asked questions

Will our electrical intake need an expensive upgrade?

Most workplaces do not need a supply upgrade, because we configure dynamic load management to balance charging against real-time building demand.

How much disruption will installation cause to daily parking?

Work takes 1 to 3 days and is phased bay by bay, so vehicles can still get in and the car park keeps operating throughout.

What documentation do we get after the site assessment?

You receive a written report covering switchboard headroom and cable routes, plus a fixed-price installation quote that stays valid for 60 days.

Is the assessment fee a sunk cost?

No. The €290 for up to 12 bays is credited in full against the installation if you go ahead, and each further 12 bays assessed is €120.

Can we start with a few bays and add more later?

Yes. The report plans cable containment and load management for the whole car park, so later bays join the same supply and cable route.

Who looks after the units afterwards?

Our aftercare engineer runs the annual service visit, which covers routine safety inspection and testing, and answers technical questions in between.

Updates

Occasional site notes on workplace charging: tariff changes, grid capacity, grant deadlines and new hardware. Nothing else.

Opens your email app. Send the request to subscribe; you are not subscribed yet.

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.