HomeSites we fit

Sites We Fit

Commercial vans plugged into charging posts in a depot yard in clear dusk light

We install electric vehicle charging points specifically where vehicles remain stationary throughout standard work shifts. Understanding site suitability ensures reliable daily operation, manageable electrical loads, and straightforward installation.

Staff car parking bays under a canopy with wall chargers mounted on concrete columns

Offices and Staff Car Parks

Office car parks are ideal environments for workplace EV charging. Staff vehicles typically remain parked for seven to nine hours during office working shifts, allowing steady 7.4 kW charging without demanding excessive electrical current. Units can be mounted directly along external building perimeters or on concrete structural columns inside covered parking areas. Because employee arrivals and departures follow consistent schedules, Lena Brandt can model charging loads against building HVAC and lighting cycles. This predictable dwell time makes workplace charging convenient for commuting staff while keeping building energy demands balanced throughout the working week.

  • Dedicated staff bays with a regular daytime dwell
  • Structural concrete columns or walls close to the bays
  • Spare capacity at the main switchboard, or room for load management
  • A clear route for a cable tray along a wall or ceiling
  • A facilities contact who can walk the site with us
Delivery vans backed into parking bays beside twin-socket EV charging posts

Depots and Commercial Fleet Yards

Commercial van depots, distribution hubs, and service yards require dependable overnight or between-shift charging. Commercial fleet vans return to base in the late afternoon and remain stationed until early morning routes commence. Ground-mounted twin posts placed along kerb islands or yard perimeters charge two commercial vehicles simultaneously from a single electrical run. With our €640 load-management module installed, depot managers can stagger charging cycles throughout the night, prioritising vans that depart earliest without overloading the main supply. This predictable routine ensures fleet vans are fully charged and ready for operation every morning.

  • Vans or cars parked overnight or between shifts
  • Bays that pair up so one post serves two vehicles
  • A yard surface that takes a post foundation or kerb island
  • Incoming supply that can carry overnight charging on a schedule
  • Room to keep cables off walkways and out of wheel paths

Suitability Checklist and Unsuitable Locations

To ensure successful installations, we maintain clear suitability standards. Suitable sites have dedicated off-street parking, an accessible electrical distribution board within practical cable distance, and vehicle dwell times of at least four hours. Conversely, we do not undertake domestic installations, residential driveways, curbside on-street parking, or motorway rapid-transit hubs requiring high-voltage DC hardware. We also decline sites without dedicated off-street bays or properties where landlord electrical consents cannot be obtained. Maintaining this strict commercial focus allows our team to deliver exceptional engineering quality, durable hardware, and reliable support for commercial workplace operators.

Suitable

  • Dedicated off-street parking
  • An accessible distribution board within practical cable distance
  • Vehicle dwell times of at least four hours

Not suitable

  • Domestic installations and residential driveways
  • On-street kerbside parking
  • Motorway rapid-charging hubs that need high-voltage DC hardware
  • Sites where the landlord's electrical consent cannot be obtained
Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.