A thorough on-site evaluation is the essential first step for any workplace charging installation. Our 90-minute technical visit determines electrical capacity, routing pathways, and physical charger placement with complete clarity.
What We Inspect During the Visit
Our assessor checks four core elements during the on-site survey. First, we examine the main switchboard and sub-distribution panels, measuring spare breaker capacity and available incoming load. Second, we trace physical cable routes across ceilings, service ducts, and containment trays to find the most efficient pathways. Third, we measure bay layouts, turning radiuses, and wall or ground mounting surfaces to ensure clear access for vehicles and cables. Finally, we compile installation plans and layout notes directly into a detailed technical review, giving your facility team complete clarity on how hardware fits into the existing building infrastructure.

Switchboard capacity
We test spare capacity at the main intake and log the baseline load.

Cable routes
We measure the runs along ceilings, walls and trenches before any drilling.

Bay layout
We mark each bay, check clearances and ground surfaces, and fix positions.

Written report
You receive a full plan and a fixed quote within 5 working days.
You prepare access. We bring the equipment.
What you prepare
- Access to the main electrical intake room
- A site escort or facilities contact
- The bays to be charged, in view
What we bring
- Precision electrical test meters and laser distance measures
- Cable pathway inspection tools
- Photographic surveying equipment
Preparing for an assessment requires minimal effort from your staff. You only need to arrange access to your main electrical intake room, nominate a site escort or facility contact, and ensure parking bays targeted for charging are viewable. On our part, we bring precision electrical test meters, laser distance measures, cable pathway inspection tools, and photographic surveying equipment. Tomas Reyes completes the technical walkthrough without disrupting your daily operations or interrupting your workplace power supply. In ninety minutes, we collect all measurements required to produce an accurate, fixed-price installation proposal.
The Four-Step Assessment Process
Our process moves in four structured steps. Step one is your initial request via web form or email. Step two is the 90-minute on-site assessment survey, where we inspect your electrical boards and bay layouts. Step three delivers your comprehensive written report and itemised quote within 5 working days, with pricing held valid for 60 days. Step four is installation, typically lasting 1 to 3 days on site, concluding with hardware commissioning, safety sign-off, and staff operational handovers. The site assessment fee is €290 for up to 12 bays, which is credited against your installation.
- RequestBy web form or email; our client desk replies within one working day.
- Site visit90 minutes on site: switchboard, cable routes and bay layout.
- Report and quoteA written report and fixed quote within 5 working days, valid for 60 days.
- FittingTypically 1 to 3 days, then handover and a staff briefing.
What Does the Written Assessment Report Include?
Your written assessment report outlines the full technical and financial picture of your project. It includes single-line supply diagrams, verified distribution board capacity measurements, recommended cable tray routing with exact distances, and designated mounting positions for chargers. We detail whether a load-management module is needed to prevent main fuse overloads during peak charging hours. Finally, the report provides a fixed-price quotation covering all hardware, cabling, fitting labour, testing, and commissioning, valid for 60 days. There are no hidden costs or provisional estimates in our documentation.