Brief to master · 8 weeks

How a job moves

An animator acting out a gesture in front of a small desk mirror, pencil in hand
A pencil drawing of a walking figure on a lit animation peg bar
Two hands aligning animation sheets on a metal peg bar on glass
Hands rolling the corners of animation paper to flip between pencil drawings
A hand laying an animation drawing face down on a lit flatbed scanner

Schedule — 8 weeks · 5 steps

line test daily at 14:00

07 / 12

01 — Overview

A standard thirty-second hand-drawn commercial moves from initial brief to master delivery in eight weeks. We combine paper key drawing with digital compositing to ensure precision and craft at every stage.

Schedule

8 weeks

Rounds

2 included

Line test

Daily, 14:00

04 — Process

From brief to master in eight weeks

The whole process ↗

Two animators discussing rough pencil storyboard panels pinned across a studio wall

Every commercial follows the same eight-week path from approved script to finished master. Because each step ends in something you can watch, agencies and directors keep control at every review point, long before anything is rendered.

Step 01 · Days 1–2

Brief and quote

You send the script, length and deadline; we send a fixed quote and a schedule.

You send

Script, length, deadline

We send

Fixed quote and schedule

Step 02 · Weeks 1–2

Storyboard and animatic

Rough pencil boards timed with scratch sound lock the cut and the rhythm.

You send

Notes on the boards

We send

Boards and a timed animatic

Step 03 · Weeks 3–4

Key drawings and line test

Key poses drawn on paper and tested every day at 24 frames a second.

You send

Notes on the line test

We send

Pencil line test

Step 04 · Weeks 5–7

Clean-up, colour and compositing

Scanned drawings are cleaned, coloured and composited into finished scenes.

You send

Colour approval

We send

Coloured scenes

Step 05 · Week 8

Sound, grade and delivery

Final grade, sound layback and masters in 16:9, 9:16 and 1:1.

You send

Final sign-off

We send

ProRes 4444 and H.264 masters

02 — The timeline

The eight-week production timeline from brief to master

Every thirty-second commercial follows a structured eight-week schedule across five distinct phases. In Step 01 (Days 1–2), you send the script, running length, and deadline, and we return a fixed quote and delivery schedule. Step 02 (Weeks 1–2) encompasses storyboard and animatic creation led by Sofia Aranda, defining shot timing and camera motion. Step 03 (Weeks 3–4) focuses on paper key drawings and pencil line tests by Adaeze Nwosu and Lukas Brandt, reviewed daily at 14:00 on our studio screen. Step 04 (Weeks 5–7) involves scanning sheets for cleanup and color by Priya Raman, followed by multi-plane digital compositing by Jonah Feld. Finally, Step 05 (Week 8) delivers sound mixing, final color grading, and master file export.

03 — Rounds of changes

How are review milestones and changes handled during production?

Clear review milestones protect project schedules and maintain drawing momentum. Our contracts include two formal revision rounds: one during Step 02 on the storyboard animatic, and one during Step 03 on the pencil line test. Adjusting timing and choreography at the line-test stage ensures motion is approved before hundreds of sheets proceed to ink, color, and compositing. Once line tests are signed off, our animators move into cleanup and color without structural delays. Any scope changes beyond the two included rounds are documented and quoted in advance by producer Wen Li to ensure total cost transparency throughout production.

04 — Delivery

Final mastering, audio layout, and format delivery

During Week 8, Jonah Feld compiles completed composite sequences, synchronizing final audio stems and applying color grade adjustments. Masters are rendered in high-bitrate ProRes 4444 and H.264 formats to satisfy television broadcast specifications and digital platform standards. Deliverables include primary 16:9 versions alongside 9:16 vertical and 1:1 square cut-downs for campaign deployment. Projects require a forty percent deposit upon contract signing, and all completed commissions include a two-year broadcast and online usage licence. Client files and production drawings are safely archived in Port Arden upon completion.

One way in: request a quote

Send us the script, the running length and the date you need it by. Our producer Wen Li reads every brief and replies with a fixed quote and a schedule within 2 working days.

hello@ugoki-animation.example · Mon–Fri 09:30–18:00

Booking from March 2027 · 2 slots

reply within 2 working days

24 fps

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.