Brief to master · 8 weeks
How a job moves





Schedule — 8 weeks · 5 steps
line test daily at 14:00
07 / 12
01 — Overview
A standard thirty-second hand-drawn commercial moves from initial brief to master delivery in eight weeks. We combine paper key drawing with digital compositing to ensure precision and craft at every stage.
Schedule
8 weeks
Rounds
2 included
Line test
Daily, 14:00

Every commercial follows the same eight-week path from approved script to finished master. Because each step ends in something you can watch, agencies and directors keep control at every review point, long before anything is rendered.
Step 01 · Days 1–2
Brief and quote
You send the script, length and deadline; we send a fixed quote and a schedule.
You send
Script, length, deadline
We send
Fixed quote and schedule
Step 02 · Weeks 1–2
Storyboard and animatic
Rough pencil boards timed with scratch sound lock the cut and the rhythm.
You send
Notes on the boards
We send
Boards and a timed animatic
Step 03 · Weeks 3–4
Key drawings and line test
Key poses drawn on paper and tested every day at 24 frames a second.
You send
Notes on the line test
We send
Pencil line test
Step 04 · Weeks 5–7
Clean-up, colour and compositing
Scanned drawings are cleaned, coloured and composited into finished scenes.
You send
Colour approval
We send
Coloured scenes
Step 05 · Week 8
Sound, grade and delivery
Final grade, sound layback and masters in 16:9, 9:16 and 1:1.
You send
Final sign-off
We send
ProRes 4444 and H.264 masters
02 — The timeline
The eight-week production timeline from brief to master
Every thirty-second commercial follows a structured eight-week schedule across five distinct phases. In Step 01 (Days 1–2), you send the script, running length, and deadline, and we return a fixed quote and delivery schedule. Step 02 (Weeks 1–2) encompasses storyboard and animatic creation led by Sofia Aranda, defining shot timing and camera motion. Step 03 (Weeks 3–4) focuses on paper key drawings and pencil line tests by Adaeze Nwosu and Lukas Brandt, reviewed daily at 14:00 on our studio screen. Step 04 (Weeks 5–7) involves scanning sheets for cleanup and color by Priya Raman, followed by multi-plane digital compositing by Jonah Feld. Finally, Step 05 (Week 8) delivers sound mixing, final color grading, and master file export.
03 — Rounds of changes
How are review milestones and changes handled during production?
Clear review milestones protect project schedules and maintain drawing momentum. Our contracts include two formal revision rounds: one during Step 02 on the storyboard animatic, and one during Step 03 on the pencil line test. Adjusting timing and choreography at the line-test stage ensures motion is approved before hundreds of sheets proceed to ink, color, and compositing. Once line tests are signed off, our animators move into cleanup and color without structural delays. Any scope changes beyond the two included rounds are documented and quoted in advance by producer Wen Li to ensure total cost transparency throughout production.
04 — Delivery
Final mastering, audio layout, and format delivery
During Week 8, Jonah Feld compiles completed composite sequences, synchronizing final audio stems and applying color grade adjustments. Masters are rendered in high-bitrate ProRes 4444 and H.264 formats to satisfy television broadcast specifications and digital platform standards. Deliverables include primary 16:9 versions alongside 9:16 vertical and 1:1 square cut-downs for campaign deployment. Projects require a forty percent deposit upon contract signing, and all completed commissions include a two-year broadcast and online usage licence. Client files and production drawings are safely archived in Port Arden upon completion.
One way in: request a quote
Send us the script, the running length and the date you need it by. Our producer Wen Li reads every brief and replies with a fixed quote and a schedule within 2 working days.
hello@ugoki-animation.example · Mon–Fri 09:30–18:00
Booking from March 2027 · 2 slots
reply within 2 working days
24 fps