A DIARY DAY

A Diary Day


A complete diary day consists of six simple sections recorded between dawn and dusk. The day closes with a single sign-off at 17:00, creating an unchangeable PDF record for the project file.

Two hands holding a digital tablet over construction drawings on a plywood table.

17:00

A DIARY DAY

Six sections, one sign-off at 17:00.


Gloved hand placing a magnet on a blank ruled whiteboard grid, a tablet resting on a concrete ledge beside it.

Morning board

The foreman photographs the gate briefing board at 06:40, before the 07:00 shift, and confirms it with one tap. The site manager and the office read it at once, and the board is never wiped away.

Construction crew arriving at the site gate at sunrise while checking a phone.

Crew & hours

Arriving trade foremen check in at the gate before seven. Headcount by trade and the zone each crew works in are recorded, so the main contractor has a register of everyone on site without passing paper rosters around.

Worker at the gate checking delivery pallets from a truck against a tablet.

Deliveries

The gate guard or materials coordinator logs supplier, material and offloading location when a truck arrives. Ticket numbers and receipt times are entered on the spot and read by the site manager that afternoon.

Close view of a worker photographing structural steel rebar ties with a smartphone.

Photos & marks

Supervisors take timestamped photos with marks, such as rebar spacing or concealed services before dry lining. Anyone on the project can read them the same day, and nothing has to be reconstructed from memory.

Worker in a waterproof jacket inspecting protective tarps covering building materials in rain.

Weather & delays

Rain, high gusts, hoist stoppages and outages are recorded when they happen by the crew affected. The delay is on the record by 17:00, so nobody has to argue later why a lift was suspended.

Hand signing a digital document on a tablet in a bright site office.

Sign-off

At 17:00 the site manager reviews all six sections in the cabin and signs off on the screen. Genba Diary then locks the day into one daily PDF that goes to the office and the handover file.

MORNING

Morning Board and Crew Hours


Every diary day begins at 06:40 at the hoist gate. The site manager or lead foreman reviews the morning whiteboard, checking shift objectives, crane allocation, and safety precautions. Instead of retyping the board into a complex software form, the foreman takes a high-resolution photograph of the physical gate board and confirms it with a single tap. Before the 07:00 shift begins, arriving trade foremen check in at the gate. The crew and hours section captures worker headcounts by trade and logs assigned zones across the site. By 07:00, the main contractor has an accurate register of every worker on site without passing paper rosters around the hoists.

DURING THE SHIFT

Deliveries, Photos, and Weather Delays


As work unfolds during the shift, three dynamic sections capture site events as they occur. When delivery flatbeds arrive, the gate guard or materials coordinator logs the supplier, material type, and offloading location under Deliveries. Throughout the day, supervisors take timestamped site photos with marked annotations under Photos & marks, recording structural steel connections, rebar spacing, and concealed plumbing before dry lining. If conditions turn severe, the Weather & delays section records rain volume, high wind gusts, hoist stoppages, or utility outages. Because entries are logged in real time at the gate or on deck, project managers avoid retrospective arguments regarding why crane lifts were suspended or deliveries delayed.

SIGN-OFF

Daily Sign-Off at 17:00


At 17:00, the site manager sits down in the site office or cabin to review the day’s record. All six sections—Morning board, Crew & hours, Deliveries, Photos & marks, Weather & delays, and Sign-off—are compiled into a clear, unified view. The site manager reviews subcontractor entries, checks that all trades have completed their logs, and signs off digitally on the screen. Once signed at 17:00, Genba Diary generates an unalterable daily PDF report. This document is automatically archived and emailed to designated project stakeholders and the main contractor’s office, ensuring that the day’s facts are locked, transparent, and ready for the final handover file.

SAMPLE DAY

Sample Site Schedule


One standard day follows six checkpoints across the site, and every crew works to the same rhythm.

06:40

Morning board photographed at Gate 2.

07:00

Crew arrivals and worker hours confirmed for every active trade.

10:30

Morning deliveries and pallet receipts logged at the hoist entrance.

14:00

Inspection photos, rebar marks and trade progress notes uploaded.

16:30

Weather readings, wind delays and equipment issues entered.

17:00

Site manager signs off and exports the daily PDF summary.

REQUEST

Request a rollout for one crew.


Start your seven-day pilot on any coming Monday. We brief your crew at the hoist gate, set up the six diary sections and stay with your team on site, with no disruption to the daily work.

or call +31 10 555 0141, Mon–Fri 06:30–18:00 CET

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.