One diary
for the site.

Every crew's day, recorded once
and read by the whole site.

One crew
one site

7-day pilot

Sections a day6

Sign-off17:00

Pilots start every Monday. Support Mon–Fri 06:30–18:00 CET, Sat 07:00–12:00.

Site manager handing a digital tablet to a foreman at an active hoist gate.

Today's
diary

06:40 Morning board · Gate 2

THE DIARY

Written at the gate, read in the office, kept for the handover.


Construction sites run on fragmented notes, wiped whiteboards, and phone messages that vanish before handover. Genba Diary replaces the scramble with a single daily log completed where work happens. Site managers and trade foremen record morning briefings, labour counts, gate deliveries, progress photos, and weather delays directly into six structured sections. Because the record closes each afternoon at 17:00, the commercial office reads an identical, verified account of the day without chasing paper.

Two hands holding a digital tablet over construction drawings on a plywood table.

CREWS

Crews that start the day at a gate.


CREW 01

Concrete & frame

Concrete construction crew pouring a foundation slab using a pump hose over rebar.

Pour sequences, pump arrivals, rebar checks and cube test logs recorded before the pour begins.

VIEW MORE

CREW 02

Fit-out & finishing

Interior finish crew installing white ceiling boards inside a bright empty classroom shell.

Room-by-room trade handovers, drylining sign-offs, ceiling closures and daily delivery checks.

VIEW MORE

CREW 03

Roofing & façade

Roofing crew working on a wide flat roof of an industrial logistics hall.

Weather thresholds, membrane protection, crane lifts and envelope inspections logged at height.

VIEW MORE

Genba Diary is built for site-based trade crews working standard day shifts. Crews on continuous underground tunnelling, or remote night maintenance shifts without mobile signal at the gate, are not yet suited to this rollout.

A DIARY DAY

Six sections, one sign-off at 17:00.


A dependable site diary must be fast to complete during the shift and impossible to dispute months later. Each day on site follows the same predictable progression across six practical sections, ensuring nothing is missed during busy handovers. Foremen log facts as they happen at the gate, building an indisputable, permanent archive that exports cleanly to the final project handover file.

Gloved hand placing a magnet on a blank ruled whiteboard grid, a tablet resting on a concrete ledge beside it.

Morning board

Photograph the gate briefing board before the 07:00 shift begins.

VIEW MORE

Construction crew arriving at the site gate at sunrise while checking a phone.

Crew & hours

Record headcount, trade allocations and shift attendance across all active subcontractors.

VIEW MORE

Worker at the gate checking delivery pallets from a truck against a tablet.

Deliveries

Log material arrivals, ticket numbers and gate receipt times straight from the delivery truck.

VIEW MORE

Close view of a worker photographing structural steel rebar ties with a smartphone.

Photos & marks

Capture progress images, mark defect locations and record rebar installations before the pour.

VIEW MORE

Worker in a waterproof jacket inspecting protective tarps covering building materials in rain.

Weather & delays

Note rain intervals, high winds and standing water affecting external work packages.

VIEW MORE

Hand signing a digital document on a tablet in a bright site office.

Sign-off

Review the daily record and apply the final site manager sign-off at 17:00.

VIEW MORE

Wide dawn view of a mid-rise concrete building frame with tower crane and hoist.

The board used to be wiped at five. Now the day stays.

Lena Hoffmann, site manager, Harbourline Construction

ROLLOUT

Seven days, one crew, no charge.


New software on a live site fails when it asks for classroom training or cuts into the early shift. We prove Genba Diary on your project in a structured seven-day pilot for one site and one crew, starting on a Monday and never stopping the work.

Day 1

Request and call

Submit the request form and complete a focused 30-minute call with the rollout lead.

Day 2

Gate briefing

A 45-minute briefing at the hoist gate before the 07:00 shift adds the crew to the diary.

Days 3–6

Diary days

The crew writes the six daily sections; our rollout specialist reads each day by 18:00 and leaves one note.

Day 7

Review

One hour with the site manager to keep, extend or stop. Nothing is billed for the pilot.

Rollout specialist in a steel-grey jacket pointing at a site plan on the hoist gate while crew members in white helmets listen.

STORIES

Three crews, three sites.


Site manager and foreman reviewing project notes on a tablet beside concrete columns.

STORY 01 · Harbourline Construction

The board that is no longer wiped

Lena Hoffmann, site manager on a six-storey concrete frame housing block with four crews. The morning board used to be erased at shift end; now every pour sequence and cube test is logged once at the gate and filed in the daily handover file.

VIEW MORE

Foreman using a tape measure against a corridor wall during a school refurbishment.

STORY 02 · Moreau Interiors

Handovers, room by room

Karim Benali, foreman on the fit-out of a school refurbishment with two crews. Ceiling closures and drylining inspections are recorded room by room, so handovers between joiners and decorators happen without late sign-offs or lost paperwork.

VIEW MORE

Project engineer on external scaffolding photographing cladding panels on a building facade.

STORY 03 · Northfield Roofing

Logs taken at height

Ruth Okonkwo, project lead on the roof and façade of a logistics hall with three crews. Wind limits, crane lifts and membrane checks are photographed at height, so the office stays informed without another climb for an inspection.

VIEW MORE

PLANS

Start free, pay per site.


PlanIncludedPrice
Pilot rolloutone site, one crew, 7 days, gate briefing$0
Site planone active site, unlimited crew members, 6-section diary, daily PDF$59 / site / month
Office planup to 10 active sites, weekly digest, export to the handover file$390 / month
Onboarding day on siteone specialist, up to 3 crews briefed$480 one-off
Extra photo storage+100 GB$15 / month
Archive exportclosed site, full diary PDF and photo set$35 / site

Prices exclude VAT. Monthly plans can be cancelled at the end of any billing month.

QUESTIONS

Before you request a rollout.


What happens if mobile signal drops at the hoist gate?

The app works fully offline. Foremen can log the morning board, headcount and deliveries without a connection; entries sync automatically once signal returns.

Which languages do field crews get?

Genba Diary runs in five languages across every board and form, so each crew and subcontractor can read and fill in their sections in the language they work in.

Who can read the daily diary?

Site managers, trade foremen and authorised office staff see the active diary. Access is limited to project personnel, so commercially sensitive entries stay private.

What happens when the 7-day pilot ends?

On Day 7 you review the diary with the site manager and decide whether to continue on the Site plan, extend the pilot or stop. Nothing is billed automatically.

How is a finished site diary exported?

The full diary and the photo archive export as an indexed PDF package, ready to go into the client's permanent handover file.

REQUEST

Request a rollout for one crew.


Start your seven-day pilot on any coming Monday. We brief your crew at the hoist gate, set up the six diary sections and stay with your team on site, with no disruption to the daily work.

or call +31 10 555 0141, Mon–Fri 06:30–18:00 CET

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.