
Architectural acoustics · Calder Wharf
Hear the room before it is finished.
We measure offices, classrooms, lecture rooms and small halls before finishes are specified. Independent acoustic data, delivered in 10 working days, to inform your architectural specifications.
- 08:30Walk the room
- 09:30Reverberation & noise
- 12:00Speech & insulation
- 15:00Findings on site
- +10 daysReport
Four kinds of room, measured the same way: empty, in daylight or after hours, with the drawings open.
Measure
before
you specify
Interior finishes decide how a room sounds long after construction is over. Wall linings, ceiling rafts, floor build-ups and glazing set how reverberation decays and how clearly speech carries. When absorption is chosen from catalogue estimates alone, flutter echoes, excess reverberance and intrusive plant noise often call for disruptive remedial work.
We measure the bare room before finish schedules are fixed. With baseline reverberation, insulation through partitions and background noise on record, architects and contractors can still adjust materials and panel positions while drawings and procurement contracts remain open to change.

What a survey measures
01
Reverberation time
We place an omnidirectional loudspeaker and precision microphones across the space to record decay in each octave band. Measuring the bare room shows how much absorption its volume needs before finishes are specified.
Typical target: 0.6–0.8 s in a classroom
02
Background noise from plant and street
We measure ambient sound levels by frequency band with the ventilation running, by day and in the evening. This separates plant rumble and traffic ingress from the room itself before interior work begins.
Typical target: NR 25–30 in quiet lecture spaces
03
Sound insulation between rooms
With a high-output test signal we measure airborne and impact transmission across shared walls and floor slabs. Finding flanking paths early shows whether the partition specification gives the privacy the rooms need.
Typical target: DnT,w ≥ 48 dB between teaching rooms
04
Speech clarity at the back row
We evaluate early-to-late sound ratios and speech transmission from the speaker position to the rear rows. It confirms whether listeners can follow spoken words without strain or a wash of reflections.
Typical target: STI ≥ 0.60 for lecture rooms
Report
Four parts, ten working days
Every report gives clear data and practical guidance to adjust finishes before procurement.

An empty room tells you what it will do to every voice that fills it.
Small hall, after hours
Recent surveys
3 case notes

A 180-seat lecture room that echoed
Room typeTiered lecture room
Volume1,450 m³
MeasuredRT 1.9 s (mid-frequency)
Target0.7–0.9 s for speech
Year2026

Ninety desks, one quiet corner
Room typeOpen-office floor
Volume1,100 m², 90 desks
MeasuredNoise and speech privacy by zone
TargetQuieter team zones
Year2026

A small hall for chamber music
Room typeRecital hall, 240 seats
Volume2,900 m³
MeasuredRT 1.4 s
Target1.6–1.8 s for chamber music
Year2026
Fees
Fixed before we travel
| Item | Fee (EUR, VAT excluded) |
|---|---|
| Small-room survey — one room up to 300 m³ (classroom, meeting room) | €680 |
| Room survey — one room 300–2,000 m³ (lecture room, open-office floor, rehearsal room) | €1,180 |
| Hall survey — one room 2,000–8,000 m³ (auditorium or small hall up to 600 seats) | €2,400 |
| Additional room, same building, same visit | €420 per room |
| Sound insulation test between two rooms (one wall or floor) | €360 per partition |
| Finish-schedule review meeting, 2 hours (on site or video) | €290 |
Every survey includes the visit, the written report delivered in 10 working days and one 30-minute call about the report. Travel within 80 km of Calder Wharf is included; beyond that, €0.60 per km return. Fees per visit, in euros, VAT excluded.
How booking works
Step 1
Send drawings and room hours. Floor plans, room volumes and the hours the empty room is available.
Step 2
Fixed fee and date confirmed within 2 working days. We check scope and travel distance, then confirm the fee in writing.
Step 3
Survey visit, one day, the room empty. Measurements run in quiet daytime hours or in an evening session.
Step 4
Report in 10 working days. Decay curves, noise levels and finish proposals in one written report.
Step 5
Optional finish-schedule review. A two-hour session, on site or by video, to go through the proposed materials.







