Halvorsen House

Halvorsen House is a commercial office property of six floors situated in Rotterdam, accommodating multiple professional tenants whose daily operations depend entirely on reliable indoor climate control. The building’s mechanical installation comprises nine rooftop condenser units paired with ducted air-handling equipment and ceiling distribution cassettes. Like many multi-tenant commercial properties, the occupants inside give little thought to the plant room or the rooftop machinery until a fan bearing squeals or indoor temperatures climb unexpectedly during a business presentation. When Kuki Climate B.V. took over the maintenance contract for Halvorsen House in 2019, our objective was to eliminate those unpredictable disruptions through disciplined preventative routines.

The facility operates on our quarterly maintenance contract, supplemented by monthly attendances during June, July, and August when cooling demands peak. The contract began with a comprehensive sixty-minute survey hour conducted by our contract manager Leila Haddad and lead service technician Tomás Ribeiro. They walked the six occupied floors, accessed the roof, catalogued all nine nameplates, and graded the physical condition of each unit from A to D. The resulting written report revealed several clogged condensate drain trays and uneven refrigeration pressures on three aging condenser circuits. By identifying these vulnerabilities before summer trading began, we established a baseline maintenance log that has guided every subsequent site visit since 2019.

A typical maintenance visit at Halvorsen House begins early in the morning, following our 07:00 depot briefing at Koelhuisweg. Our service van arrives on site by 07:40 so technicians can inspect rooftop condensers before direct sun creates harsh working conditions and thermal distortion. Tomás Ribeiro inspects the fan assemblies, checks belt tension, clears airborne debris from coil fins with low-pressure wash equipment, and inspects electrical contactors for pitting. Meanwhile, Samuel Mensah, our F-gas certified refrigeration technician, connects digital manifold gauges to verify suction pressures, superheat levels, and subcooling values across the nine separate refrigerant circuits, ensuring no slow leaks compromise seasonal performance or environmental compliance.

Once mechanical work on the roof concludes and internal building loads stabilise, technicians move indoors after 11:00 to inspect air distribution grilles and plant room controls. Daichi Mori configured the building’s controls schedule to balance fresh-air ventilation with energy conservation, preventing simultaneous heating and cooling conflicts across different tenanted suites. Technicians inspect filter differential pressure gauges, replace pleated filters as scheduled, and verify that condensate pumps drain freely into internal soil stacks. Each task is completed methodically, avoiding noise or disruption in corridors and tenanted office suites.

Before departing for our 16:30 handover at the service desk, the technicians complete the site service log. At Halvorsen House, this record consists of one durable physical binder stored on the shelf beside the main chiller panel, alongside a shared digital PDF record transmitted directly to the building’s facilities manager. The log documents exact operating pressures, filter replacement dates, motor running currents, and technician signatures. For the facilities team at Halvorsen House, this operational continuity means no guesswork, no forgotten maintenance history, and plant that remains dependable through every season.

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.