Vesta Audio asked for a reveal that felt close: 250 guests in the room, a live stream for press, and a product that had to stay under a cloth until the exact second it was lit. The brief came in six weeks before the date and was answered within two working days.
We built the stage in the warehouse first. The plinth, the lift and the lighting plot were pre-rigged and cabled there, then loaded out in flight cases that rolled straight into the hall at 06:00. Ines Duarte ran the line check at 10:00 and the full technical run-through at 14:00, so the presenter rehearsed against the real cues.
At 19:00 the cloth came off on a single cue called by Tomasz, the light came up on the plinth and the stream feed switched at the same moment. By 23:30 the hall was struck and handed back swept. The debrief report reached Vesta five days later.
