Process

From a first brief to a clean hall, in about six weeks.

Fees

Our delivery process spans a typical brief-to-show duration of six weeks, translating initial executive objectives into a secure, rehearsed production. Every phase is governed by clear milestones, fixed cost frameworks, and precise cue documentation.

A black lighting truss lit with cool white beams over an empty dark stage

( SIX WEEKS )

Six weeks from brief to show.

Every phase has a named owner, a fixed milestone and a printed page. Nothing on show day is a surprise.

( 01 )

The Five-Phase Delivery Framework

We execute every engagement through five disciplined phases. Week 0 is Brief, where client lead Amara Osei and founder Mara Lindqvist review schedule requirements, room capacities, and executive targets. Weeks 1 to 2 encompass Concept and Budget, establishing CAD drawings, technical allocations, and binding line-item figures. Weeks 3 to 5 cover Build and Rehearse, assembling flight cases, verifying line checks, and running cue tests. The fourth phase is Show Day, coordinated through our timed run sheet. The final phase is Strike and Report within five days, providing logistical sign-off, equipment load-out, and financial closure.

( 01 )

Brief

Week 0

You send a brief. We reply within two working days with a first schedule and a rough budget.

( 02 )

Concept and budget

Weeks 1–2

A half-day discovery workshop, then one page with scope, plan and price.

( 03 )

Build and rehearse

Weeks 3–5

Drawings, line checks and a rehearsal against the real cues.

( 04 )

Show day

Load-in 06:00, doors 18:30

The same printed run sheet every time. A named person for each line.

( 05 )

Strike and report

Plus five days

Overnight strike, hall handed back as found, then a written report.

Crew in black rolling white flight cases through a loading door at early morning

( RUN SHEET )

Day-of-Show Run Sheet

On show days, our 38 on-call crew members follow an exact six-milestone operational schedule. At 06:00 Load-in begins, rolling flight cases into the hall and hoisting primary lighting truss grids. At 10:00 Line check commences, verifying sound levels, optical signals, and redundant video feeds. Rehearsal starts at 14:00, conducting full speaker walk-throughs and cue timing under stage manager Tomasz Okafor. Doors open at 18:30 for guest entry. The Show runs from 19:00 under constant prompt desk supervision. Strike begins at 23:30, dismantling truss and clearing the hall before dawn.

06:00

Load-in

Flight cases roll in, the truss goes up on its hoists.

10:00

Line check

Sound, video and the stream are proved on every path.

14:00

Rehearsal

Every speaker walks the stage against the real cues.

18:30

Doors

Guests arrive into a hall that has already been proved.

19:00

Show

The stage manager calls every cue from the prompt desk.

23:30

Strike

The rig comes down and the hall is handed back by dawn.

Demo · Use it free in ShipPress · Or buy without the app for US$10English · 繁體中文 · 日本語 · Français · Deutsch
Demo only: this is switched off here.