The Survey

A Fuchi Glazing survey takes 45 minutes on site to record structural dimensions, frame conditions, and lifting access before any quote is issued.

A Fuchi Glazing survey takes 45 minutes on site to record structural dimensions, frame conditions, and lifting access before any quote is issued. We conduct survey visits Tuesday to Thursday across Lindenport to ensure every replacement pane fits on arrival.

What does the survey visit measure?

Surveyor holding a laser distance meter inside an empty shopfront opening beside a notebook.
  • Width at three heights2,412 / 2,409 / 2,410 mm
  • Height at three points2,840 / 2,841 / 2,839 mm
  • Both diagonalsout-of-square tolerance 3 mm
  • Sill and threshold levelverified horizontal datum
  • Frame and bead conditionsound anodised aluminium
  • Access and lifting routekerb, door widths, stairs

During a standard survey visit, our surveyor inspects six specific structural factors using calibrated laser distance meters and optical levels. We take width readings at three separate heights across the opening, such as 2,412 mm, 2,409 mm, and 2,410 mm, to detect inward frame bowing. We take height measurements at three points along the width to identify floor settlement. Both corner-to-corner diagonals are verified against an out-of-square tolerance threshold of 3 mm. We inspect sill and threshold levels for slope or water ingress issues. We examine the condition of existing aluminium or timber frame rebates, gaskets, and glazing beads. Finally, we survey the delivery and lifting route from the pavement kerb through doorways and stairwells to confirm safe handling for heavy glass units.

What should you have ready for the surveyor?

To complete the 45-minute survey efficiently, property owners and shop managers should ensure three essential requirements are arranged prior to our arrival. First, we require unobstructed physical access to every window opening, interior partition run, or entrance door being measured, including clearing window displays or stock. Second, working electrical power must be accessible on site for charging optical measurement instruments and laser meters. Third, an authorised keyholder or site contact must be present to unlock exterior gates, grant access to communal service corridors, and discuss operational opening hours. Having these three items prepared enables our surveyor to complete comprehensive measurements without delays, inspect concealed fixings, and confirm practical parking arrangements for our delivery vehicle and glass rack.

Access

Every opening reachable, with displays and stock cleared.

Power

A working socket for charging the instruments.

Someone with keys

A named person to unlock gates and service corridors.

How does a survey visit unfold minute by minute?

A survey visit follows a strict 45-minute schedule so business managers know exactly what to expect on site. At minute 0, our surveyor arrives, introduces themselves, and signs the site visitor register. By minute 5, we capture detailed high-resolution reference photographs of every aperture, existing beads, and surrounding masonry. At minute 10, we record laser measurements across three widths and three heights to document frame deflection. At minute 25, we check both diagonal dimensions to test squareness within our 3 mm tolerance and verify sill levels. At minute 35, we inspect the lifting path, measuring kerb distances, door clearances, and stairs. Finally, at minute 45, we provide a verbal summary to the site contact before leaving, leading to a written quote within 3 working days.

0'

Arrive

Arrive and sign in

The surveyor signs the site register and meets your keyholder.

5'

Photos

Photographs of every opening

Each opening, frame and bead is photographed before anything is measured.

10'

Widths

Three widths, three heights

Laser readings at three heights and three points.

25'

Diagonals

Diagonals and levels

Both diagonals against the 3 mm tolerance, sill and threshold levels.

35'

Access

Access and lifting route

Kerb, door widths and stairs for the glass.

45'

Summary

Summary before we leave

What we measured and when the written quote will arrive.

What does our written quote contain?

Following the site inspection, Ruth Okonjo and Corin Abbott compile your written quote, delivered via email within 3 working days. The quote remains valid for 30 days and provides clear itemised pricing without hidden extras. It outlines the precise glass specification, whether toughened float glass, laminated safety glass, or acoustic partition screens, along with required glazing beads, structural silicone, and door closers. The standard survey fee of €120 is clearly credited against the total cost upon job acceptance. The document also specifies projected lead times, site arrival hours from 06:30, waste glass collection, and the included week 6 aftercare inspection. Once you accept, we immediately schedule Nadia Petrova for the second check measure before the glass order is placed.

Send a photo of the opening and the address. We reply with two survey times within one working day.